Small Type Fiber Optical Splice Closure box 12-96
Small Type Fiber Optical Splice Closure box
1.The Parts of Splice Tray
A.Splice Module with 4 Cable ties 2.4 X 92mm
B.Splice Organizer
C.Box Size:230×185×85mm L×W×D
2.Installation Procedure:
2.1 Cable Preparation
(1)Cable Sequentially through Sealing Nut, Sealing Claws, Seal and
through the Closure Bottom Case, allow appropriate fiber lengths
for placement within the Splice Tray.
(2)Tighten the Sealing Nut, and then proceed with stripping of
fiber cable inside the Closure Bottom Case.
(3)Repeat steps(1)and(2)until cable preparation is complete.
2.2Cable Fixation
(1)Loosen the Sealing Nut,adjust cable to the appropriate length,
and tighten the Sealing Nut to fix cable in place.
(2)Repeat step(1)for rest of the cable to complete this procedure.
*Caution:(1)For non-functional entrance ports, brown solid plugs
provided are to be used with the sealing assembly to ensure a good
seal.
(2)Solid plugs should protrude the
outer edge of the Sealing Nut by 1-3mm for a complete seal.
2.3 Fiber Placement and Splicing
(1) Use Cable Ties to fix the fiber-containing PVC soft tubing onto
the Splice Tray, and fix the Splice Organizer onto the Splice Tray.
(2) Place fiber within the Splice Tray, made sure fiber lengths are
correct for splicing work and placement after splicing.
(3)After each individual fiber pair is spliced, place the splice joint
onto the grooves of the Splice Organizer and the extra fiber on and
around the Splice Tray.
(4) After all splicing work is complete, coat the grooves on
Splicing Organizer with a layer of silicon gel for protection of
splicing joints.
2.4 Closure Assembly
(1)After placing all splice fibers within Splice Trays, put the
transparent Splice Tray Cover over the topmost Splice Tray, and use
the Fixing O-Ring to fix the cover and the Splice Trays.
(2) Fix the Un-leaking O-Ring on the appropriate groove of the
Closure Bottom Case, and place the Upper Closure over the bottom
case, and then tighten the 8 sets of closure assembly screws to
complete closure assembly.
(3)Perform a final seal tightness check for:
* Sealing Nuts on entrance ports (non-functional ports should have
solid plugs in place of cable)
*8 Sets of closure assembly screws.
2.5 Opening the Closure
(1) Before opening, clean all closure surfaces.
(2) Follow procedure 2.4 in reverse order to open the closure.
After necessary work is completed, follow procedure 2.4 to
reassemble the closure.